Tunnel Progress Review
THE TUNNEL IS NOW FULLY OPERATIONAL AND SHOULD BE USED BY GREEN STAFF, MEMBERS, VISITORS AT ALL TIMES WHEN CROSSING THE BUSY A57
Temp bridge with exposed-telephone cable(February 13th 2010) | |
Road drains removed and removal of rubble(February 17th 2010) | |
Rails concreted in for the installation of tunnel section(March 2nd 2010) | Installation of tunnel section(March 8th 2010) |
Drainage channels fitted and base of tunnel fully concreted(March 11th to 17th) |
Installation of tunnel section(March 8th 2010) |
Side Walls being constructed(28th March 2010 - 17th April 2010) | Side Walls being constructed(28th March 2010 - 17th April 2010) |
Side Walls Completed with pathway in place(17th April 2010) | Side Walls being constructed(28th March 2010 - 17th April 2010) |
Temp Bridge removed and new road in place(24th April 2010) | North side pathway completed(12th April 2010) |
| Finished side walls and head wallWeek ending 23rd April 2010 |